My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-28_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2008-01-28_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:43 PM
Creation date
5/6/2009 3:23:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
1/28/2008
Doc Name
Cost Estimate
Type & Sequence
MR226
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filename : C056-000 <br />Agency or organization name : Division Of Reclamation, Mining And <br />Permit or job action :MR226 <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />26a -seal 8 geotech drill holes borehole 1 2.0 $226 <br />26b -backffll 4 backhoe trenches excavate 1 2.11 $159 <br /> SUBTOTALS : 4.11 <br />includes inflation factor adI o <br />ustment of NA /o <br />TOTAL DIRECT COST <br />INDIRECT COSTS :::::::.......................................................................................... .......................... ................................................ ... <br />................... <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />$385 <br />$385 <br />$4 <br />NA <br />$38 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $50 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $435 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $22 <br />CONTINGENCY - NA* NA total = NA <br />County:Routt <br />' contingencies accounted for at task level TOTAL INDIRECT COST = $72 <br />TOTAL BOND AMOUNT (direct + indirect) _ $457
The URL can be used to link to this page
Your browser does not support the video tag.