Laserfiche WebLink
,(gm,sus <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />May 1, 2009 <br />Ms. Cindi Byrns / <br />Natural Soda, Inc. <br />3200 RBC Road 31 <br />Rifle, CO 81650 <br />STATE OF COLORADO <br /> <br />MAY 0 4 2009 <br />Division of ReC12mation, <br />Mining and Safety <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />J <br />Re: Natural Soda Inc., Nacholite Project, Permit No. M-1983-194, Approval of 112 Reclamation Permit <br />Technical Revision Package, TR-27.,,/ <br />Dear Ms. Byrns: <br />On May 1, 2009 the Division of Reclamation, Mining and Safety approved the Technical Revision application <br />submitted to the Division on March 31, 2009, addressing the following: <br />• Installation of core hole 12H-C that will be completed in the new 12H cavity. The core hole will be used to <br />verify resources and the presence or absence of halite in- the new 12H cavity that is in the existing Panel 2. <br />The core hole will likely be converted into a B-Groove monitoring well. Natural Soda, Inc. must comply <br />with State of Colorado Office of the State Engineer Water Well Construction Rules, 2 CCR 402-2, <br />specifically, Rule 14.2.1 which states that a monitoring and observation hole must be constructed within <br />ninety days of giving notice to the State Engineer and construction must be completed within 72 hours after <br />drilling the borehole. <br />• The revision also includes an additional 1.44 acres of disturbance for the well pad and access road <br />associated with the proposed additional well. <br />The terms of Technical Revision No. 27 approved by the Division are hereby incorporated into Permit No. M-1983- <br />194. All other conditions and requirements of Permit No. M-1983-194 remain in full force and effect. <br />Staff calculations estimate the additional cost to reclaim the site to be $23,983.00, added to the existing required <br />reclamation bond amount of $1,810,465.00 for a total reclamation bond amount of $1,834,448.00, rounded off to <br />$1,834,450.00 . The estimate is based on the increased reclamation liability associated with Technical Revision No. <br />27. Natural Soda, Inc. must submit and have accepted the Financial Warranty for the technical revision to the <br />permit to become active. Please review the estimate carefully. Should there be any questions or corrections <br />contact staff immediately. For questions regarding bond placement please contact Elizabeth Taliaferro at phone <br />no. (303) 866-3567, extension 8148. <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines