Laserfiche WebLink
Table 5 <br />Four Corners Materials - Bayfield Gravel Operation <br />Lagged Depletions and Water Replacement Requirement for Year One & <br />Two <br /> (1) (2) (3) (4) <br /> <br />Month <br />Total Depletions Total Depletion Rate <br />(Input to Glover <br />Analysis) <br />Lagged Depletions <br />(Appendix B) Gosney Pump <br />Requirements Due to <br />Irrigation Season Out-Of- <br />Priority Depletions <br /> (acre feet) (gallons per minute) (acre feet) (cubic feet per second) <br />Jan-09 0.44 3.24 0.33 0.00 <br />Feb-09 1.77 14.34 1.51 0.00 <br />Mar-09 4.69 34.20 3.74 0.00 <br />Apr-09 8.38 63.24 7.10 0.00 <br />May-09 12.16 88.75 10.33 0.17 <br />Jun-09 16.28 122.81 14.46 0.24 <br />Jul-09 15.15 110.59 14.09 0.24 <br />Aug-09 11.43 83.41 11.45 0.19 <br />Sep-09 9.58 72.25 10.00 0.17 <br />Oct-09 5.67 41.40 6.69 0.11 <br />Nov-09 2.71 20.42 3.97 0.00 <br />Dec-09 0.45 3.31 1.71 0.00 <br />2009 Totals 88.7 85.4 <br />Jan-10 0.44 3.24 1.19 0.00 <br />Feb-10 1.77 14.34 2.11 0.00 <br />Mar-10 4.69 34.20 4.17 0.00 <br />Apr-1 0 8.38 63.24 7.41 0.00 <br />May-10 12.16 88.75 10.56 0.18 <br />Jun-10 16.28 122.81 14.63 0.25 <br />Jul-10 15.15 110.59 14.21 0.24 <br />Aug-10 11.43 83.41 11.53 0.19 <br />Sep-10 9.58 72.25 10.07 0.17 <br />Oct-10 5.67 41.40 6.73 0.11 <br />Nov-10 2.71 20.42 4.01 0.00 <br />Dec-10 0.45 3.31 1.73 0.00 <br />2010 Totals 88.7 88,4 <br />Column Notes <br />(1) Depletions, see Table 3, Column (5). <br />(2) Depletion rate for input to Glover Analysis. <br />(3) Equals the lagged depletions from the edge of the gravel pit to the Pine River (200 ft) based on the Glover <br />(4) Equals the required pumping rate from augmentation source. <br />P:\031-007\100 - Pine River\Bayfield Facility\SWSP\Red Dot\4-23-09 ammendment\ <br />Bayfield PiT SWSP Tables ammended 4-23-09.xis Wright Water Engineers, Inc. Des by: BAP <br />February 2009 Ckd by: PRF