My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-01_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-05-01_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:07 PM
Creation date
5/1/2009 3:13:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/1/2009
Doc Name
Letter Application and Public Notice
From
Oxbow Mining, LLC
To
DRMS
Type & Sequence
TR63
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0? <br />I0` <br />OXBOW MINING, LLC <br />3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 USA Tel (970)929-5122 Fax <br />(970)929-5177 <br />April 29, 2009 <br />Ms Marcia Talvitie, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety RECEIVED <br />691 County Road 233, Suite A-2 <br />Durango, CO. 81301 iAY 0 2009 <br />pivis,on of ;reclamation, <br />Re: Oxbow Mining LLC, Permit No. C-1981-022 Mining and Safety <br />TR-63 Application for Additional Gob Vent Boreholes. <br />Dear Ms. Talvitie, <br />The purpose of this letter is to request Technical Revision No. 63 to the Oxbow Mining LLC <br />(OMLLC) Permit No. C-1981-022. This TR provides for the addition of gob vent boreholes to <br />the mine plan for two north panels LW-15 and LW-16. <br />To aid in the ventilation of hazardous mine gases, additional gob vent boreholes will need to be <br />installed in the north panels LW-15 and LW-16. The additional sites are shown on the attached <br />Drawing 2.05-MI, Sheet 6 of 6, "General Facilities, Gob Vent Boreholes." In addition we are <br />submitting revised PAP pages 2.05-50a and Exhibit 2.04-E3, Item 9 - Methane Drainage Well <br />Information. <br />OMLLC has previously permitted gob vent borehole programs (TR 46, 48, 53, 54 and 56). The <br />subject of this TR is a 1 year plan where drill pads, associated temporary, light use roads and up <br />to 23 mine ventilation boreholes will be installed, fitted with pumps for mine ventilation, and <br />eventually reclaimed. Mining into this north district will eventually involve some of the deepest <br />overall overburden depth (up to possibly 2,800') and Oxbow is taking particular care to make <br />sure adequate ventilation boreholes are installed to provide for miner safety. <br />Site Construction, Operation and Reclamation <br />The project will be very similar to that which had previously taken place for current borehole <br />sites. Overall, the sites will be accessed via the pre-existing Bear Creek canyon ranch road. <br />New road segments will be constructed using sidecast construction techniques, cutting and filling <br />as needed to achieve a typical road width of about 10 - 16 feet. <br />0 Page 1
The URL can be used to link to this page
Your browser does not support the video tag.