My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-01_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-05-01_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:04 PM
Creation date
5/1/2009 2:09:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
5/1/2009
Doc Name
New 112c permit application
From
MA Concrete Construction
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 5 of 6 <br /> - MINING OPERATIONS - <br />K. FINISHED PRODUCT STOCKPILE(S) <br /> Maximum Stored At One Time: 113,000 Tons <br /> Proposed Controls For Finished Product Stockpile: <br /> ® Watering Times/Day <br /> ? Chemical Stabilizer <br /> ? Compacting Of Piles <br /> ? Enclosures Type: (Complete or Partial) <br /> ® Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br /> ? Other (specify) <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILE(S) <br /> Haul road distance (one way) 600 Feet <br /> Road surface silt content (if known) unkown % <br /> Posted speed limit on haul road 10 m.p.h. <br /> ® Watering <br /> ? Frequent (Watering Frequency of 2 or More Times Per Day) <br /> ® As Needed <br /> ? Chemical Stabilizer <br /> ? Gravelling <br /> Other: <br /> Vehicle Type Ca aci Ems Weight No. Of Trips Per/Day <br />1 18-Wheelers Tons Tons <br />2 10-Wheelers 20 Tons 12 Tons 150 <br />3 4-Wheelers Tons Tons <br />4 Tons Tons <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br /> Amount of material for off-site transfer: 112,500 Tons per year <br /> On-site haul road distance (one way) 3,500 Feet <br /> Road surface silt content (if known) unknown % <br /> Posted speed limit on-site: 10 m.p.h. <br /> ® Watering <br /> ? Frequent (Watering Frequency of 2 or More Times Per Day) <br /> ® As Needed <br /> ? Chemical Stabilizer <br /> ? Gravelling <br /> ? Paving <br /> Other: <br /> Vehicle Type Ca aci Empty Weight No. Of Trips Per/Day <br />I 18-Wheelers Tons Tons <br />2 10-Wheelers 20 Tons 12 Tons 150 <br />3 4-Wheelers Tons Tons <br />4 Tons Tons <br />Revised September 2004 hqp://www.cdphe.state.co.us/a/stationa!y.hti-ni
The URL can be used to link to this page
Your browser does not support the video tag.