My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-01_PERMIT FILE - M2009035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009035
>
2009-05-01_PERMIT FILE - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:04 PM
Creation date
5/1/2009 2:09:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
PERMIT FILE
Doc Date
5/1/2009
Doc Name
New 112c permit application
From
MA Concrete Construction
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />- MINING OPERATIONS - <br />I? <br />ESTIMATED EMISSIONS <br /> Year For Which Actual Data Applies: <br /> <br /> <br />Pollutant Estimated Emissions <br />(tons/yr) at throughputs <br />requested <br /> <br />Actual Emissions <br />From Data Year <br />Estimation <br />Method <br /> Controlled Uncontrolled <br />Particulate <br />PM-10 <br />A. TOPSOIL REMOVAL N/A <br />Maximum Tons Removed Per Day: <br />Tons Removed Per Year: <br />Proposed Controls For Topsoil Removal: <br />? Moist Material <br />? Water Spray <br />? Other (specify) <br />• <br />B. <br />TOPSOIL STOCKPILES <br />Times/Day <br />Page 2 of 6 <br />? Enclosures Type: (Complete or Partial) <br />? Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />? Other (specify) <br />Maximum Stored At One Time: <br />Proposed Controls For Topsoil Stockpile: <br />? Watering <br />? Chemical Stabilizer <br />? Compacting Of Piles <br />C. OVERBURDEN REMOVAL <br />Equipment Used For Removal: <br />Maximum Tons Removed Per Day By Dragline: <br />Tons Removed Per Year By Dragline: <br />Number Of Scraper Hours Per Day: <br />Number Of Scraper Hours Per Year: <br />Proposed Controls For Overburden Removal: <br />® Moist Material <br />? Water Spray <br />? Other (specify) <br />Scraper <br />8 <br />2,400, <br />• <br />Revised September 2004 <br />N/A <br />Tons <br />http://www.cdphe.state.co.us/ap/stationary.htmI
The URL can be used to link to this page
Your browser does not support the video tag.