My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (364)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (364)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
4/30/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VI Appendix 8, G.2 /H - Pan Evaporation Background / Tech. Specs.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9AC <br />SMITH WILLIAMS CONSULTANTS, INC. <br />SECTION 01050.0 CONSTRUCTION STAKING AND CONSTRUCTION DOCUMENTATION <br />PART 1: GENERAL <br />1.01 SUMMARY: <br />This Section defines the control staking services required by the CONTRACTOR. All staking and surveying <br />will be the responsibility of the CONTRACTOR unless otherwise specifically defined in this section. All <br />grade checking and transferring of lines and grades from CC&V's stakes will be the CONTRACTOR'S <br />responsibility. <br />1.02 CONTROL STAKES: <br />Control stakes which are reference points for all construction work will be conspicuously marked. It shall be <br />the responsibility of the CONTRACTOR to inform his employees and his subcontractors of their importance <br />and the necessity for their preservation. At least forty-eight (48) hours written advance request for removal of <br />control stakes shall be given to CC&V. A total of ten (10) control stakes will be provided to the <br />CONTRACTOR by CC&V for this work. <br />Control stakes shall be set one time only. <br />1.03 FLAGGING CODE: <br />A color code will be established by the CONTRACTOR during the course of the project indicating specific <br />• colors for the various kinds of stakes to be set. <br />1.04 STAKING: <br />A. CC&V will provide vertical and horizontal reference control stakes in the proximity of the work as <br />discussed in Article 1.02 of this Section. <br />B. The CONTRACTOR shall be responsible for setting construction and grade stakes and for proper <br />preservation of control points. <br />C. The CONTRACTOR will provide as-built coordinates and elevations for the Underdrains, Leak <br />Detection system, Low Volume Solution Collection piping and High Volume Solution Collection <br />piping or as requested by the MANAGER. <br />1.05 CONSTRUCTION CERTIFICATION DOCUMENTATION: <br />A. The CONTRACTOR shall be responsible for accurately surveying the locations and elevations, and <br />where applicable, the type, thickness, and geometry of any and all pipes and fittings, ditches, <br />geosynthetic materials, breaks in fill or cut slopes, general grading, change in fill or synthetic <br />material type, and any other aspect of the work to facilitate construction and as required by the <br />MANAGER. <br />B. Submittals By CONTRACTOR Upon Completion of Work: <br />Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall furnish <br />MANAGER with "Record Drawings" (also referred to as "As-Built Drawings") of the Work. The <br />Record Drawing will be drawn at a scale of 1-inch equals 100 feet with 10 foot topographic contour <br />interval, and on a 24-inch by 36-inch sheet. All surveying Record Drawings shall be signed and <br />Section 01050 <br />Construction Staking <br />Page 1 of 3 <br />March 14, 2008 <br />Revision 0 <br />SAProjec1s\1125 COW Phase 5 VLFU - Tech SpecsVUequa\01050 revised.doc
The URL can be used to link to this page
Your browser does not support the video tag.