My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (364)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (364)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
4/30/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VI Appendix 8, G.2 /H - Pan Evaporation Background / Tech. Specs.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />SA/C <br />SMITH WILLIAMS CONSULTANTS, INC. <br />¦ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the design DRAWINGS and project SPECIFICATIONS to <br />ensure that the CQA Plan can be implemented; <br />¦ coordination of all construction activities associated with the various CONTRACTOR(S); <br />¦ scheduling and coordinating construction activities with required CQA testing and activities; <br />¦ overseeing the construction quality control operations performed by the CONTRACTOR(S); <br />¦ approve specific corrective measures to be implemented during construction when deviations <br />from the SPECIFICATIONS occur; <br />¦ ensure that required quality control testing has been performed in accordance with the CQA <br />Plan and to the satisfaction of the CQA Monitor; and <br />¦ ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to Smith Williams. The DESIGN <br />ENGINEER is the individual or firm responsible for the design and preparation of the project construction <br />DRAWINGS and project SPECIFICATIONS. The DESIGN ENGINEER is responsible for approving all <br />design and project SPECIFICATION changes, modifications, or clarifications encountered during <br />construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in <br />compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING <br />ENGINEER will be responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the firm or <br />individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is the official <br />CQA representative of CC&V and has the responsibility of overseeing the CQA aspects of the project. In <br />this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and refers <br />specifically to (To Be Determined). The CQA Monitor has the authority to stop any aspect of the work <br />that is not in compliance with the CQA Plan. Work would then be resumed once corrective action has <br />been approved by the MANAGER and CERTIFYING ENGINEER. The specific responsibilities of the <br />CQA Monitor include: <br />review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br />documents; <br />¦ review all CONTRACTOR QC submittals and make appropriate recommendations; <br />¦ observe geosynthetic material delivery, unloading, and storage; <br />Section 01400.2 Page 2 of 11 <br />Geosynthetic CQA Plan <br />March 14, 2008 <br />Revision 0 <br />SAProjecl5\1125 CC&V Phase 5 VLFU -Tech SpecsVv"W01400.2 r0.doc
The URL can be used to link to this page
Your browser does not support the video tag.