My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (364)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (364)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
4/30/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VI Appendix 8, G.2 /H - Pan Evaporation Background / Tech. Specs.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ell <br />9AC <br />SMITH WILLIAMS CONSULTANTS, INC. <br />¦ coordination of all construction activities associated with CONTRACTOR; <br />¦ scheduling and coordinating construction activities with required CQA testing and activities; <br />¦ overseeing the construction quality control operations performed by CONTRACTOR; <br />¦ approve specific corrective measures to be implemented during construction when deviations <br />from the SPECIFICATIONS occur; <br />• ensure that required quality assurance testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br />¦ ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan, DESIGN ENGINEER refers specifically to Smith Williams. DESIGN ENGINEER is <br />the individual or firm responsible for the design and preparation of the DRAWINGS and SPECIFICATIONS. <br />DESIGN ENGINEER is responsible for approving all DESIGN and SPECIFICATION changes, <br />modifications, or clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />• In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in compliance <br />with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER shall be <br />responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The CQA Monitor is the firm or individual responsible for performing the CQA tasks outlined in this CQA <br />Plan. The CQA Monitor is the official CQA representative of CC&V and has the responsibility of overseeing <br />the CQA aspects of the Work. In this CQA Plan the CQA Monitor is associated with the CERTIFYING <br />ENGINEER, and refers specifically to (To Be Determined). The CQA Monitor has the authority to stop any <br />aspect of the Work that is not in compliance with the CQA Plan. Work would then be resumed once <br />corrective action has been approved by MANAGER. The specific responsibilities of the CQA Monitor <br />include: <br />¦ review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br />¦ review all CONTRACTOR QC submittals and make appropriate recommendations; <br />¦ obtain preconstruction and construction samples and perform material evaluation testing as <br />required; <br />¦ monitor foundation preparation activities as discussed in Section 6.02.01 and material <br />placement as discussed in Section 6.02.02; <br />¦ assure that testing equipment used and tests performed are conducted according to <br />SPECIFICATIONS and industry standards; <br />Section 01400.1 Page 2 of 9 March 14, 2008 <br />Earthworks CQA Plan Revision 0 <br />SAProjeds\1125 CC&V Phase 5 VLFU -Tech Specs\Arequa\01400.1.r0.doc
The URL can be used to link to this page
Your browser does not support the video tag.