My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-29_GENERAL DOCUMENTS - C1981033
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981033
>
2009-04-29_GENERAL DOCUMENTS - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:57 PM
Creation date
4/29/2009 1:47:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
4/29/2009
Doc Name
Preliminary Submittal Adequacy Review Letter & Cost Estimate for Bond Release
From
DRMS
To
Bear Coal Company
Permit Index Doc Type
General Correspondence
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Task # : 005 State : Colorado <br />Date : 0411712009 County : Gunnison <br />User : SLB Site : Bear No. 3 <br />Agency or organization name :CDRMS <br />Permit or other job action :Phase 1 Bond Release <br />Task description : Regrade ditches <br /> <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 325C L Horsepower:_ <br />140 <br /> Weight (MT):,. -----28.18 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $38.60 NA Shift basis : _. 1 perd_ay <br />Operating cost/hour : $49.54 100 Data source: . _(CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $121.11 Total fleet cost/hour : $121.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 330 CCY factor : 1.125 volume : 371 LCY <br /> <br />Source of estimated volume: Map 11-1 <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 9091o) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment : 1.00 (Cat _HB) <br />Job efficiency adjustment : 0.83 (1 shift/da_y)_ <br />. Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 386.42 LCY/hour <br />Adjusted hourly unit production : 320.73 LCY/hour <br />Adjusted hourly fleet production : 320.73 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 1.16 hours <br />Unit cost : $0.378 per LCY Total job cost : $140 <br /> <br />Permit/job #: C-1981-033 <br />Abbreviation :none <br />Filename :C033-005
The URL can be used to link to this page
Your browser does not support the video tag.