Laserfiche WebLink
CIRCES Cost Estimatina Software <br />NET JOB HOURS AND JOB SUPERINTENDENT COST <br />PROJECT IDENTIFICATION <br />Date : 0411712009 <br />User: SLB <br />Task: 015 <br />Site: Bear No. 3 <br />State :Colorado <br />County :Gunnison <br />Agency or organization name : CDRMS <br />Permit or other job action : Phase / Bond Release <br />Task description :Job foreman <br />TASK LIST... CONVERSION OF TOTAL TASK HOURS TO NET JOB HOURS TASK EQUIP. CPM NET <br />NO. TASK DESCRIPTION HOURS USED CHARTING HOURS <br /> Task 001 Phase I released <br />__002 -Backfili/regrade bench 12.44 1 325C A 0.00 _ <br />_00_3 -Regrade water treatment pond 9.56 1- 07SU 0 9.56 <br />004 -Rip portal bench 6.45 107 0 6.45 <br />005 -Regrade ditches 1.16 1 325C A 0.00 <br />006 -Regrade sediment pond 17.32 1 - D7SU 0 17.32 <br />007 -Redistribute topsoil 53.69 1 D7 0 53.69 <br /> <br />07b <br />-Rip topsoil <br />17.38 <br />1 D3 <br />75% A _ <br />4.34 <br />008 -Demolition 24.00 various A 0.00 <br />009 -Seal portals 120.00 NA A 0.00 <br />011 -Revegetation 7.28 NA 0 7.28 <br />012 -Revegetation 1.80 NA A 0.00 <br />013 -Revegetation 4.00 NA A 0.00 <br />014 -Equipment mobilization 33.34 haul rig 27.34 6.00 <br />016 Weed Control 48.00 Na 0.00 <br />017 -Rill/gully repair over liability period 40.00 1 D3 A 0.00 <br />018 -Seal alluvial wells' 16.00 drill A 0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL TASK HOURS : 412.42 NET JOB HOURS : 104.64 <br />NET HOURS TO TASK HOURS PERCENTAGE : 25.37% <br />JOB SUPERINTENDENT COST/HOUR <br />Superintendent's vehicle description :Light Duty Pickup, 4x2, 112 T. <br />Cost Breakdown : Superintendent labor cost/hour : <br />Vehicle ownership cost/hour <br />Vehicle operating cost/hour <br />Percent vehicle utilization <br />Permit/job # : C-1981-033 <br />Abbreviation : none <br />Filename : C033-015 <br />ted vehicle operating cost/hour <br />Total Superintendent cost/hour <br />$35.96 <br />$2.73 <br />$7.82 <br />25.00 % <br />$1.96 <br />$40.65 <br />Job shift basis : 1 per day <br />Cost data source : CRG Data <br />JOB TIME AND COST Total job time (hours) : 104.64 Total superintendent cost : $4,254