Laserfiche WebLink
FORBS : _ <br />sheet 2 of 2 <br />2 <br />SHRUBS AND TREES (seed) : <br />MULCHING and MISCELLANEOUS <br />Materials item no. 1 : <br />item no. 2: <br />item no. 3 : <br />item no. 4: <br />DESCRIPTION (data source) UNITS / ACRE UNIT COST / UNIT COST/ACRE <br />No mulch materials required <br /> <br /> <br /> <br />Application -method no. 1 :No mulch application <br />method no. 2: <br />method no. 3: <br />TOTAL MULCH MATERIALS COST/ ACRE : $0.00 <br />TOTAL MULCH APPLICATION COST I ACRE : $0.00 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST I FERT TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST / PLANT COST / PLANT . <br />PELLET COST I PLANT COST I ACRE <br />Cottonwood, Narrowleaf 136 Tubling, 10 cu. in. container{BRI) $1.19 $1.19 NA $2.38 $323.68 <br />Willow, Sandbar 18 Tubling, 10 cu. in. container (SRI) $1.11 $1.19 NA $2.30 $41.40 <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST I ACRE : $365.08 <br />JOB COST No. of acres : 4.00 Cost / acre : $365.08 INITIAL JOB COST : $1,460.32 <br />Estimated failure rate (percent) : 50.00% Cost / acre': $365.08 RESEEDING JOB COST : $730.16 <br />Selected replanting work items : N TOTAL JOB COST : $Z190 <br />• TOTAL SEEDS / SQ. FT.: 0.0 • TOTAL POUNDS PLS / ACRE : 0.00 • TOTAL SEED MIX COST / ACRE : $0.00 <br />Seed application - method : No seed application required TOTAL SEED APPLICATION COST / ACRE : $0.00