My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-29_GENERAL DOCUMENTS - C1981033
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981033
>
2009-04-29_GENERAL DOCUMENTS - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:57 PM
Creation date
4/29/2009 1:47:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
4/29/2009
Doc Name
Preliminary Submittal Adequacy Review Letter & Cost Estimate for Bond Release
From
DRMS
To
Bear Coal Company
Permit Index Doc Type
General Correspondence
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 007 State :Colorado Permit/job# C-1981-033 _ <br />Date : 0411512009 County : Gunnison Abbreviation : none <br />User: SLB Site : Bear No. 3 Filename : C033-007 <br />Agency or organization name: CDRMS <br />Permit or other job action :Phase l Bond Release <br />Task description : Redistribute topsoil over facilities area <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D7R DS Series 11- 7SU Horsepower : 24.0 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : CR <br />G) <br />( <br /> Utilization % _ <br />_ <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $137.33 Total fleet cost/hour : $137.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 LCY <br />Source of estimated volume :Permit application Volume 1, p. 2.05-23R <br />Source of estimated swell factor : Division estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB_) <br />Unadjusted hourly production : 311.1 LCY/hr Dozing method : 1.00 _ <br />(gen.) _ <br /> Visibility: 1.00 _(avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Consolidated lidated stockpile Spoil pile : 0.60 (fnd-so <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) _ <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />- Dry packed <br />E <br />arth Adjusted unit production : 104.77 LCY/hr <br />_ <br />_ Adjusted fleet production : 104.77 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 53.69 Hours <br />Unit cost : $1.311 /LCY Total job cost : $7,373
The URL can be used to link to this page
Your browser does not support the video tag.