My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (365)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (365)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:11 PM
Creation date
4/29/2009 10:02:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL V APP 8 Appendix D- Assessment of Underground Workings within Limits of Phase 5 Valley Leach
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />March 2000 <br />APPENDIX D <br />-12- <br />5.1 Remedlation of Isolated Shafts, Stopes, And Shallow Surface Mines <br />993-2099.150 <br />Based on observations made in the Phase IV area, none of the shafts appear to be more <br />than approximately 12 feet square in plan dimensions (many are S feet or less), although <br />some are very deep. The general approach to remediate isolated shafts and shallow surface <br />mines are as follows: <br />? For open excavations where the depth to bedrock is less than 7 feet to <br />the final Soil Liner Fill subgrade surface: Backfill open shafts with <br />Coarse Shaft Backfill to approximately 10 feet below the finished surface <br />grade and then place concrete, cemented rockftll, and Structural Fill as <br />discussed below. <br />0 <br />? For open excavation where the depth to bedrock is greater than 7 feet to <br />the final Soil Liner Fill subgrade surface: Backfill the open shafts with <br />Coarse Shaft Backfill to 3 feet below the soil/bedrock interface. Then <br />place concrete, cemented rockfill, and Structural Fill as discussed below. <br />? For collapsed excavations where the depth to bedrock is less than 7 feet <br />to the final Soil Liner Fill subgrade surface: Excavate collapsed <br />materials from shafts to a depth of 25 feet below finished grade, then <br />backfill with Coarse Shaft Backfill to approximately 10 feet below the <br />finished grade, and then place concrete, cemented rockfill, and <br />Structural Fill as discussed below. <br />? For collapsed excavations where the depth to bedrock is greater than <br />7 feet to the final Soil Liner Fill subgrade surface: Excavate collapsed <br />materials from shafts to a depth of 25 feet below finished grade, then <br />backfill with Coarse Shaft Backfill to approximately 3 feet below the <br />soil/bedrock interface, and then place concrete, cemented rockfill, and <br />Structural Fill as discussed below. <br />? Excavate shallow surface mines to rock or to 25 feet below the final Soil <br />Liner Fill subgrade surface. The shallow surface mines will then be <br />backfilled with compacted Select Structural Fill and/or Structural Fill to <br />the final subgrade elevation. <br />40 <br />1:19WC09RMAL REPORT%MAPPD.DW Golder Associates
The URL can be used to link to this page
Your browser does not support the video tag.