Laserfiche WebLink
• • • <br />Project: Cripple Creek Geohydrology Date: 4/8/2008 <br />Task: Carlton Outflow Adjustment Page 4-2 <br />CARLTON TUNNEL FLOW RESULTS <br />2500 <br />2000 <br />1500 <br />E <br />a <br />rn <br />3 <br />_o <br />LL <br />1000 <br />500 <br />0 <br /> <br /> <br />N M V (t) (O N CV M C) N M V (n (0 I? <br />rn rn rn rn 0) T T T 0 0 0 0 0 0 0 0 <br />C C C C C C C C C C C C C C C C <br />-B - Measured Flow (gpm) f Flow Adjustment (gpm) - Adjusted Flow (gpm) <br />Adrian Brown Consultants, Inc.