2009-04-21_REVISION - M1998105
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998105
>
2009-04-21_REVISION - M1998105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
4/28/2009 8:19:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998105
IBM Index Class Name
REVISION
Doc Date
4/21/2009
Doc Name
Reclamation cost update & notice of surety increase
From
DRMS
To
Grand Junction Pipe and Supply
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Replace Topsoil on Phase I and 111 inslopes above water level <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Shiftbasis : 1 per day <br /> Data source : (C:RG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,613 LCY factor : NA volume : 1,613 LCY <br /> <br />Source of estimated volume :6" of topsoil spread over approx. 2.0 acres of pond shore <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Partly consolidated stockpile Spoil pile: 0.80 (fnd-rl) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,980 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 600 Ibs/LCY <br />1 Net correction : 0.96 <br /> , <br />Weight description <br />Top Soil Adjusted unit production : 1350.50 LCY/hr <br /> Adjusted fleet production : 1,350.50 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 1.19 Hours <br />Unit cost : $0.119 /LCY Total job cost : $191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.