Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER - ONLY WORK <br /> <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: 004 State : Colorado Permit/job #: M-2008-010 <br />Date : 0412012009 County : Montezuma Abbreviation :none <br />User : WHE Site : Mud Creek Pit Filename : M010-004. <br />Permit or other job action : Adjustment per Rule 4.2.1(4) <br />Task description : Topsoil Replacement on 10.7 acres of flat area <br />HOURLY EQUIPMENT COST <br />Model : Cat 633E Series 2 (2001) <br />Cost Breakdown : Job utilization % <br />Ownership cost/hour : $80.67 NA <br />Operating cost/hour : $117.98 100 <br />Operator cost/hour : $24.95 <br />Total unit cost/hour : $223.59 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 17,263 LCY factor <br />Shift basis : 1 per day <br />Horsepower : 490 <br />Weight (UST) : 56.34 <br />Cost data source : (CRG) <br />NA <br />Total fleet cost/hour : $223.59 <br />Loose <br />NA volume : 17,263 LCY <br />Source of quantity take-off :(10. 7ac)(43560sf/ac)(1'D)/27 = 17,262.67 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Dry packed Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity: 32.16 LCY Adjusted capacity : 28.60 LCY *** <br />Cycle Time (load + haul + spread + return) : Loading time : 0.90 minutes <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : loading time per pair on push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 700 -2.8 8.0 5.2 1,375 0.66 minutes ** <br />Return : 700 2.8 8.0 10.8 1,065 0.66 minutes ** <br />"travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown, not average Total cycle time 2,92 minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 6,800 Adjusted Hourly Production ; <br />Altitude adjustment factor : 0.96 (Cat HB) Unadjusted unit production : 587.60 LCY/Hour*** <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 468.20 LCY/Hour <br /> Adjusted fleet production : 468.20 LCY/Hour <br />Net job correction factor : 0.80 2 times volume on push-pull models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 36.87 Hours <br />Unit cost : $0.478 /LCY Total job cost : $8,244 <br />