Laserfiche WebLink
. CC&V will construct and maintain sediment control measures where needed during <br />operations. This will consist of the installation of BMPs, concurrent reclamation, and <br />implementation of other effective methods as appropriate. The type of structure used in a <br />particular area will be based on site specific conditions and constraints as well as the <br />anticipated longevity of the structure. The Storm Water Management Plan will be <br />updated to address the disturbance associated with the MLE and will provide information <br />on locations and types of BMPs to be used as well as periodic inspections of the storm <br />water controls to maintain their effectiveness. <br />• <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />9-4