My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (351)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (351)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
4/27/2009 11:48:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
Teller County Vol. 1, Attachment 4, 8.6 to 14.0
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• occur during the last two years while monitoring is ongoing. <br />11.4.4 External Solution Storage Pond <br />Reclamation of the ESP remains unchanged from that approved in Amendment <br />No. 8. The ESP likely will be used to facilitate final rinsing of the VLF. Solution <br />contained in the ESP at the conclusion of VLF rinsing will be spray evaporated or <br />treated with H2O2 and applied to the VLF. Any sludge in the bottom of the ESP <br />will be removed, tested, and appropriately disposed, most likely by hauling to the <br />VLF. The pond liner will be folded into the bottom of the pond and the <br />impoundment area filled. Facilities demolition debris may be placed in the pond <br />bottom prior to filling. The filled pond area will be graded, soil placed, and the <br />area will be revegetated. <br />11.4.5 Haul Roads <br />Haul road reclamation will occur in the same manner as previously approved for <br />haul roads in Amendment No. 8. At the conclusion of mining activities, haul <br />roads designated for closure will be regraded to blend with the surrounding <br />terrain. Fill material will be pulled onto the road surface, where possible, and the <br />• remaining road surfaces will be ripped. Cut slopes will be reduced or filled with <br />material, where appropriate, to achieve the desired configuration. As appropriate <br />on a site-specific basis, culverts may be removed or retained, with proper drainage <br />accommodated in the field. Soil typically is part of the fill pulled onto the road <br />surface or will be retrieved if in close proximity to the road to assist with the <br />revegetation effort. <br />The reclamation plan calls for reclaiming the haul roads outside the limits of the <br />surface mines and OSAs. In consultation with appropriate representatives of <br />Teller County, CC&V may later propose to retain and utilize some of the existing <br />road corridors to provide light-vehicle access to the area. However, it is not <br />possible to specify routes at the present time. <br />11.4.6 Ancillary Support Facilities <br />Ancillary support facilities, including the crusher facility and associated <br />structures, the ADR facilities and the fire assay laboratory, the overland conveyor <br />and the load out bin, the Ironclad maintenance-warehouse-office, and the <br />associated utilities, monitoring systems, and mobile equipment will be removed or <br />• reclaimed in the same manner as previously approved. In consultation with <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />11-15
The URL can be used to link to this page
Your browser does not support the video tag.