My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
4/27/2009 8:55:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/24/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 4/12/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />Completed LOB Underground Workings <br />4/18/2009 <br />ID# Northing Eastin Elevation Comments <br />2001 50199.458 40213.67 10174.951 On edge of VLF footprint. Shallow shaft. Backfill with structural fill. <br />2002 49681.855 39111.85 10222.514 Shallow shaft. Backfill with structural fill. <br />2003 54670.511 37987.468 10189.265 Not in LOB haul road footprint <br />2004 54317.717 37821.732 10112.226 In cut. No remediation needed. <br />2005 54228.037 38046.401 10174.113 Shaft or collapse into Raven Tunnel 10,100' elv. World is in cut. no remediation. <br />2006 54066.629 38153.84 10175.45 Not in LOB haul road footprint <br />2007 54048.3 38214.844 10190.934 Not in LOB haul road footprint <br />2008 54036.13 38197.064 10188.578 Not in LOB haul road footprint <br />2009 53994.91 38183.725 10168.716 Not in LOB haul road footprint <br />2010 53982.346 38121.653 10148.466 Shaft in cut. No remediation. Cut being performed in area <br />2011 53982.138 38121.823 10148.473 Shaft in cut. No remediation. Cut being performed in area <br />2012 54004.148 38113.49 10151.034 Shaft in cut. No remediation. Cut being performed in area <br />2013 54000.689 38085.834 10140.068 Shaft in cut. No remediation. Cut being rformed in area <br />2014 53974.82 38089.862 10133.673 Shaft in cut. No remediation. Cut being performed in area <br />2018 54573.755 37562.074 10071.456 Shallow shaft in cut. Backfill shaft with structural fill. Removed during cut <br />2019 54641.412 37585.877 10065.009 Shallow shaft in cut. Backfill shaft with structural fill. Horiz. drift running in an east. <br />2020 54652.14 37500.975 10037.916 Shallow shaft in fill. Backfill shaft with structural fill. Backfilled <br />2021 54749.88 37727.329 10090.254 Haulage tunnel in cut. No remediation Removed during cut <br />2022 54866.79 37768.44 10081.047 Shallow shaft in cut. Backfill shaft with structural fill. Backfilled <br />2023 55130.037 37883.8 10081.745 Not in LOB haul road footprint <br />2024 55065.199 38273.248 10255.281 Not in LOB haul road footprint <br />2025 55147.916 38335.892 10257.719 Not in LOB haul road footprint <br />2026 55132.735 38272.95 10249.238 Not in LOB haul road footprint <br />2027 55164.21 37686.05 0 Haulage tunnel in fill. No remediation Fill laced Completed <br />2028 54615.713 37641.886 10068.216 Removed during LOB Pad cut <br />2029 53959.714 38101.139 10124.015 Removed during LOB Pad cut <br />2035 53445.518 38116.952 9981.517 No Remiediation Required <br />2037 53262.75 38599.62 9974.29 No Remiediation Required <br />2039 52921.48 38797.4 9790.24 Remiediation Complete <br />Pending LOB Underground Workings <br />4/18/2009 <br />2015 53978.476 37990.783 10100.528 Tomado Shaft at road elevation. Dee workings down to 9,000 ft elv. <br />2016 53897.185 37972.07 10079.118 Sloped at surface connected to Tomado Shaft. Could reach %000 ft elv. <br />2017 54129.748 37916.308 10106.209 In cut. Like no remediation required. Will assess as construction progresses. <br />2030 53693.594 38234.679 10071.748 Backfilled for safe in LOB Delivery Road cut. Will assess as construction progresses. <br />2031 53780.553 37961.822 10049.108 Backfill Remiediation <br />2032 53704.086 37963.731 10031.741 Backfill Remiediation <br />2033 53426.918 37966.416 9952.933 Backfill Remiediation <br />2034 53393.731 38048.556 9952.576 Backfill Remiediation <br />2036 53511.741 37946.571 9976.853 No Remiediation Required. <br />2038 53155.24 37951.52 9854.09 Wafter Shaft: Backfill Remiediation per Remiediation Plan 3/20/2009 <br />Figure 2 LOB Underground Working Summary <br />Sheet 9 of 11 <br />LOB Weekly Report WE 04.18.09.D
The URL can be used to link to this page
Your browser does not support the video tag.