My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-23_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2009-04-23_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:50 PM
Creation date
4/24/2009 10:10:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
4/23/2009
Doc Name
Letter Application and Public Notice
From
Coors Energy Company
To
DRMS
Type & Sequence
TR40
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nit .. ,'?s?+\ <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 028 Date: 04 / 22 /_2009 <br />Permittee: Coors Energy Company <br />Street: P.O. Box 467 RECEIVED <br />APB 24 2009 <br />City: Golden Djv_ <br />, -ciamation, <br />State: Co Zip Code: 80402 _ 0467 Mining and Safety <br />Brief Description of Revision: Modify Final Reclamation <br />Contours - Long Term <br />Spoil Area <br />Public Notice Attached: Yes X No _ (Required for PRs and TRs) <br />Bond Increase: Yes _ No _ Federal _ Non-Federal X Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed 0. 0 Acres <br />Permit Acres <br />Affected 0 Acres <br />Mineral Ownership - <br />Mineral Private 0 . _2 ._Acres <br />Mineral Federal 0 . 0 Acres <br />Surface Ownership - <br />Private Land 0 .0 Acres <br />Federal Land 0 0 Acres <br />State Land (+/-) _ _ 0 .0 Acres <br />Mineral State (+/-) X . 0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.