Laserfiche WebLink
KERR COAL COMPANY <br />KERR MINE <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Pond C <br />Date 9-18-08 <br />1. Water Level (above or below dewatering orifice) Above Below <br />2. Sediment Level [below dewatering orifice (designed sediment level)] <br />3. Sediment Removal Required Yes No <br />4. Outflow (depth of flow in weir) <br />5. Outflow <br />Ft <br />Ft <br />Ft <br />CFS <br /> PROBLEM <br />FEATURES <br />YES <br />NO COMMENTS <br />EROSION: <br />Rills & Gullies on Embankments <br />Wave Erosion <br />Spillway Erosion <br />Burrows <br />Others <br /> <br />STRUCTURAL: <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br /> <br />STRUCTURES: <br />Principal Spillway <br />Clogged Orifice <br />Clogged or Damaged Culvert <br />Weir <br />Emergency Spillway <br />Erosion <br />Riprap <br /> <br />MAINTENANCE REQUIRED: <br />MAINTENANCE PERFORMED: <br />ADDITIONAL COMMENTS: Pond Reclaimed. <br />NAME OF INSPECTOR <br />rLA <br />I