My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - M1988112 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2007-12-19_REVISION - M1988112 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:38:58 PM
Creation date
4/23/2009 1:09:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Appendix C- Hydraulic Calculations
From
TELESTO
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
between the current tailings pool level and the embankment crest to contain the entire <br />volume of runoff from the PMP event on the tailings surface while maintaining adequate <br />freeboard. The TDA spillway design takes advantage of this attenuation capacity by <br />incorporating a weir to control the rate of outflow from the TDA surface. This weir <br />controls the peak flow rates entering the spillway, thereby reducing the potential for <br />erosion damage to downstream areas. Table 4 summarizes the storage volume, water <br />surface elevation, inflow and outflow of the tailings pond in response to the design storm. <br />The results on Table 4 show the estimated peak runon onto the TDA during the design <br />storm event of 7881 cfs. The peak flow through the TDA reclamation spillway is <br />reduced to approximately 427 cfs. The resulting water pond on the TDA surface reaches <br />a maximum elevation of 8,610.3 feet during the PMP. The pond level recedes to an <br />elevation of 8,605.7 feet within 24 hours, with less than 1 foot of water remaining on the <br />TDA surface after 2 days. Topographic mapping of the TDA shows the dam crest <br />elevation varying from 8618 to 8620, indicating 8 to 10 feet of freeboard being <br />maintained during the PMP event for the reclamation design. <br />C.2.2 Design/Hydraulic Analysis <br />Using the hydrograph output information from HEC-HMS, flow depths and velocities in <br />the three spillway reaches and associated downgradient structures were analyzed using <br />Manning's equation (U.S. Army Corps of Engineers, 1991, Chow, 1959). Figure 2 <br />shows the locations of these proposed structures, consisting of a spillway, stilling basin <br />and outlet weir for the tailings pond. The design and detailed analyses of these structures <br />is presented below. <br />C.2.2.1 Outlet Weir <br />The outlet weir has been designed to control the outflow of water from the TDA during <br />extreme precipitation events. This structure will act to reduce the rate at which water is <br />released from the tailings impoundment during extreme precipitation events, thereby <br />reducing the size of the spillway required, and potential for damage to downstream areas.
The URL can be used to link to this page
Your browser does not support the video tag.