Laserfiche WebLink
Southwestern <br />Ecological <br />Services <br />It <br /> <br />-i Fff- d 4z/ <br /> <br /> <br />37 East Colorado Avenue • Denver, Colorado 80210-3105 • (303) 722-9067 <br />April 21, 2009 <br />Jared Ebert <br />40 Division of Reclamation, Mining and Safety <br />Room 215 <br />1313 Sherman Street <br />Denver, CO 80203 <br />RE: Definition of undisturbed, bonded land to be released from the older permit areas. <br />Dear Jared: <br />Enclosed please find some materials that accurately define the undisturbed, bonded land requested for release. <br />Included is am 11" x 17" map showing the locations of the different categories of land present in this operation, <br />including the land requested for release. Also included is an 8'/z" x 11" map showing the codes for each parcel that <br />are used in the acreage accounting sheet on a separate page. <br />As you can see, there is a total of 43.32 acres included in the request for release of undisturbed, bonded land. The <br />total affected land to remain bonded is 196.7 acres which includes all land that is currently in use for mining and <br />processing as well as all land that is being reclaimed. This land will be included in the new reclamation costs and <br />bonding. In addition to the 196.7 acres a technical revision has been submitted to add the 300 acres in the new <br />amendment area which will bring the total bonded land to 496.7 acres. At that point all anticipated affected land will <br />be included in the reclamation bond. Please keep in mind that much of the 138.88 acres in reclamation processes no <br />longer counts in the 150 acre limitation required by the lease. To be more precise, only areas RC1 (16.69 acres) and <br />RC2 (12.3 acres) count in the 150 acre limitation. All the rest of the 138.88 acres has been seeded or will be in the <br />next few weeks. Bond must remain on the seeded acres not included in the 150 acres until it is considered adequate <br />for release by the Division. Thus the total of areas MN1, MT, RC1, and RC2 is 86.81 acres. That leaves a total of <br />63.19 acres available for affecting before reaching the 150 acre lease limitation. That is about equal to the entire area <br />of Area 1U in the amendment that could be disturbed without doing any additional seeding. Of course, in the next <br />year areas RC1, RC2, and whatever is disturbed in MT will be reclaimed because mining will shift to the amendment <br />Area 1U. Area MN1 will essentially remain as is until the end of the operation as that includes access and processing. <br />So area MN1 (43.3 acres) will remain as a fairly constant base acreage of affected, unreclaimed land throughout the <br />operation. Other affected land and affected land that is being reclaimed will vary from time to time with only <br />unseeded, affected land counting in the 150 acre lease limitation. It is complicated, to be sure, but this is the only way <br />to meet both the requirements of the lease and the requirements of the reclamation law without creating problems <br />with compliance in one or the other or both. <br />Thank you. <br />Sincerely, <br />Mark A. Heifner <br />cc: Scott Davis