My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2009-04-21_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:47 PM
Creation date
4/22/2009 2:48:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
4/21/2009
Doc Name
Bonding Analysis
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR14
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Mine <br />Climax Mo7ybdenum Hwy 91- Fremont Pass <br />Climax, Colorado 80429 <br />A Freeport-McMoRan Company Phone (719) 486-2150 <br />Fax (719) 486-2251 <br />April 20, 2009 <br />Mr. Allen Sorenson Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Bonding Analysis, TR-r4 Stipulation, Climax Mine, Permit No. M-1977-493 <br />Dear Mr. Sorenson: <br />Please find attached the Climax Mine Site's reclamation cost estimate for the new mill and <br />accessory buildings authorized under Technical Revision No. 14. As the Division is aware, the <br />facilities were not completed due to the suspension of the 2010 Project due to unfavorable <br />market conditions. The attached bond costs reflect structures with footings, but no cement <br />flooring. <br />The cost estimate for the partially completed facilities is $2,002,445. The bond cost allocated to <br />the facilities demolished to date is $1,484,046. Although there is a slight difference between the <br />facilities demolished and the facilities constructed, Climax believes that the earthwork and <br />preparation activities performed on the Robinson Tailings Area and Arkansas River Channel, <br />which carry a bond cost of $4,482,398 and $892,352, respectively, greatly exceeds the $518,339 <br />costs difference between demolition and construction; thereby not warranting a bond adjustment <br />upwards. <br />If you have any questions or need additional information, please do not hesitate to contact me at <br />(719) 486-7718. <br />Sincerely, <br />AIC- <br />Johnny Pappas <br />Climax Environmental Manager <br />Attachment <br /> <br />Cc: K. Kioska (w/o Attachment) <br />E. Bower (w/o Attachment)
The URL can be used to link to this page
Your browser does not support the video tag.