Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 005 <br />Date : 0411712009 <br />User: SLB <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State :Colorado Permit/job #: C-1981-033 <br />County : Gunnison Abbreviation : none <br />Site : Bear No. 3 Filename : C033-005 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase 1 Bond Release <br />Task description :Regrade ditches <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 325C L Horsepower : 140 <br /> Weight (MT) : 28.18 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $38.60 NA Shift basis : 1 per day <br />Operating cost/hour : $49.54 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $121.11 Total fleet cost/hour : $121.11 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 330 CCY factor : 1.125 volume : 371 LCY <br /> <br />Source of estimated volume: Map 11-1 <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE _ <br />Cycle time value : 0.29 - minutes <br />Bucket Capacity <br />Rated bucket capacity: 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 9091o) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 386.42 LCY/hour <br />Adjusted hourly unit production : 320.73 LCY/hour <br />Adjusted hourly fleet production : 320.73 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 1.16 hours <br />Unit cost : $0.378 per LCY Total job cost : $140