Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 0411512009 <br />User: SLB <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase 1 Bond Release <br />Task description : Regrade water treatment pond <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br />Operating cost/hour : $56.19 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $137.33 Total fleet cost/hour : $137.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,567 CCY factor : 1.125 volume : 2,888 LCY <br /> <br />Source of estimated volume :Estimate based on Drawing 11-4 <br />Source of estimated swell factor :Division estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 854.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-mt) <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,000 feet <br />Material weight : 2550 Ibs/LCY <br />Weight description <br />Earth - Drv Packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.455 /LCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado Permit/job# : C-1981-033 <br />County: Gunnison Abbreviation : none <br />Site :Bear No. 3 Filename : C033-003 <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.35 <br />Adjusted unit production : 302.01 LCY/hr <br />Adjusted fleet production : 302.01 LCY/hr <br />Total job time : 9.56 Hours <br />Total job cost : $1,313