Laserfiche WebLink
sheet 2 of 2 <br />KVgL/NULC Ga.(V r ma... <br />Machine <br />Description <br />-Light Duty Pickup, 4x4, 314 T. <br />-Flatbed Truck, 4x2, 15K GVW <br />Total <br />Cost/hour/unit <br />$30.93 <br />$49.28 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$30.93 <br />$49.28 <br />Return Trip <br />Cost/hr/fleet <br />$30.93 <br />$49.28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $80.21 $80.21 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Nucla / Naturita <br />Transportation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.44 0.44 Total non-roadable mob/demob cost' : $383.67 <br />Return time (hours) = 0.44 0.44 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost $71.29 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.89 0.89 <br />............. <br />:....:. . <br />JOB TIME AND COST Total job time : 3.78 ours <br />Total job cost : $455