Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />-Flatbed Truck, 42, 15K GVW <br />Return Trip <br />sheet 2 of 2 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : <br />Nucla / Naturita <br /> Total one-way travel distance : 20.0 miles <br />Transportation Cycle Time : Non- Average travel speed : 35.0 mph <br /> Roadable Roadable <br /> Equipment Equipment <br />Total non-roadable mob/demob cost' : <br />$1,588.22 <br />Haul time (hours) = 0.57 0.57 <br /> <br />Return time (hours) = <br />0.57 <br />0.57 two round trips with haul rig <br /> <br />* <br />** <br /> <br /> <br />6 <br />$91 <br />Loading time (hours) <br />- = 0.50 NA : <br />Total roadable mob/demob cost . <br />Unloading time (hours) = 0.50 NA <br />** one round trip, no haul rig <br />Subtotals = 2.14 1.14 <br /> <br />:>;:: <br /> <br /> <br /><:>... ....::::::::::.....>:...;.:. ;:.;::...... .. <br /> <br /> <br />:. _:. .:. <br /> <br />:; ..,. <br />:..:.:.::.......:...::...: <br />........ <br />Total job time : <br /> <br /> <br />.29 hours <br />JOB TIME AND COST Total job cost : $1,680