Laserfiche WebLink
Agency or organization name DBMS <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :push 4" topsoil over Stagging Area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Basic machine : Cat D8R Series /1- 8U (2005) <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 535 LCY <br />Swell <br />factor <br />Horsepower: 310 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />$57.40 NA <br />$77.43 100 <br />$1.68 25 <br />$32.78 NA <br />$169.28 Total fleet cost/hour : $16 <br />Loose <br />NA volume : 535 LCY <br /> <br /> <br /> <br /> <br /> 9.28 <br />Source of estimated volume :1 acre * 43560/27'' .33 ft cover <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,627.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 3.00 % (r <br />Average site altitude : 6,350 feet <br />Material weight : 2,650 Ibs/LCY <br />Job Condition Correction Factors <br />operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.07 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Source <br />(Cat HB) <br />(gen.) -- <br />(1 shift/day) <br />(fnd-ro <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U)