Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />..... . <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = 0.33 0.33 <br />Return time (hours) = 0.33 0.33 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours),= 0.50 NA <br />Subtotals = 1.65 0.65 <br />Total non-roadable mob/demob cost " <br />two round trips with haul rig <br />Total roadable mob/demob cost'"` <br />`* one round trip, no haul rig <br />Walsenburg <br />18.0 miles <br />55.0 mph <br />$895.20 <br />$20.25 <br />JOB TIME AND COST Total job time : 3.31 hours <br />Total job cost : $915