My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-23_REVISION - M2003068
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003068
>
2009-02-23_REVISION - M2003068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
4/20/2009 3:34:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003068
IBM Index Class Name
REVISION
Doc Date
2/23/2009
Doc Name
Cost summary form
From
DRMS
To
Mary's Mountain Gravel
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />.. <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Walsenburg <br />Transportation Cycle Time : Non- Total one-way travel distance : 25.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.56 0.56 Total non-roadable mob/demob cost $2,488.66 <br />Return time (hours) = 0.56 0.56 `two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $34.37 <br />Unloading time (hours) = 1.00 NA ?• one round trip, no haul rig <br />Subtotals = 3.11 1.11 <br /> <br />JOB TIME AND COST Total job time . 6.22 hours <br /> Total job cost : $2,523
The URL can be used to link to this page
Your browser does not support the video tag.