Laserfiche WebLink
RnennRi F Fnli i[PMFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.56 <br />Return time (hours) = 0.56 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 2.12 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />quipment <br />0.56 Total non-roadable mob/demob cost " <br />0.56 ' two round trips with haul rig <br />NA Total roadable mob/demob cost <br />NA one round trip, no haul rig <br />1.12 <br />Pagosa Springs <br />14.0 miles <br />25.0 mph <br />$1,303.35 <br />$34.64 <br />JOB TIME AND COST Total job time : 4.24 hours <br />Total job cost : $1,338