Laserfiche WebLink
Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br /> Operating cost/hour : $56.19 100 <br /> Ripper op. cost/hour : $0.00 0 <br />--- <br /> Operator cost/hour: T32.78 NA <br /> Total unit cost/hour : $137.33 Total fleet cost/hour : $137.33 <br />. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 100 CCY factor : 1.215 volume : 122 LCY <br />Source of estimated volume :maps <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 410.8 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-M <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth 160.22 LCY/hr <br />Adjusted unit production <br />Adjusted fleet production <br />160.22 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.76 Hours <br />Unit cost : $0.857 /LCY Total job cost : $104