My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-16_REVISION - M1983067
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983067
>
2009-04-16_REVISION - M1983067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:14:49 PM
Creation date
4/20/2009 3:33:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983067
IBM Index Class Name
Revision
Doc Date
4/16/2009
Doc Name
Construction Observation Report- Stagecoach Reservoir Slurry Wall
From
Deere & Ault Consultants, Inc.
To
DRMS
Type & Sequence
SO3
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />TABLE OF CONTENTS <br />Page <br />INTRODUCTION ..............................................................................................................................1 <br />PROJECT DESCRIPTION .................................................................................................................1 <br />CONSTRUCTION SUMMARY ........................................................................................................2 <br />QUALITY CONTROL TESTING ......................................................................................................3 <br />DISCUSSION .....................................................................................................................................4 <br />General ....................................................................................................................................4 <br />Desanding Operations .............................................................................................................5 <br />Backfill Quantity .....................................................................................................................5 <br />Bedrock Conditions ................................................................................................................5 <br />CONCLUSIONS AND RECOMMENDATIONS .............................................................................5 <br />List of Tables <br />Table 1 Materials Quality Control Program, Soil/Bentonite Slurry Trench Cutoff Wall <br />Table 2 Stagecoach Reservoir Laboratory Test Results <br />List of Fieures <br />Figure I Vicinity Map <br />Figure 2 Slurry Wall Alignment and Test Hole Locations <br />Figure 3a Summary Log of Exploratory Borings <br />Figure 3b Summary Log of Exploratory Borings <br />Figure 4 Summary Log of Exploratory Test Pits <br />Figure 5 Legend for Summary Log of Exploratory Borings <br />Figure 6 Construction Photos <br />List of Plates <br />Plate 1 Slurry Wall As-Built Plan <br />List ofAppendices <br />Appendix A Test Summary - Trench Slurry and Backfill <br />Appendix B Trench Depth Worksheet <br />- 1 - January 2005 <br />Stagewach Final Construction Report.doc
The URL can be used to link to this page
Your browser does not support the video tag.