My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-20_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2009-04-20_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:44 PM
Creation date
4/20/2009 11:06:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
4/20/2009
Doc Name
Comment Letter
From
J. E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MT6
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINE ENGINEERING <br />MINE RECLAMATION <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7th STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />jestover bresnan.net <br />April 15, 2009?G?ufG? <br />2 ? 2009 <br />Mike Boulay ??R aC?on, <br />Division of Reclamation, Mining & Safety "OuSaetl <br />rd p1v?s,.. and <br />101 South 3 Street, Suite 301 M <br />?- Grand Jun`ctiorr, -CO -8T501 - <br />Re: McClane Canyon Mining LLC, McClane Canyon Mine <br />Midterm Permit Review <br />Permit No. C-1980-004 <br />Dear Mr. Boulay: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' letter dated April 1, 2009 transmitted its midterm permit review for the <br />referenced operation. On behalf of McClane Canyon Mining LLC, following are its <br />comments on the midterm review reclamation bond estimate: <br />1. The haul distance for task 9 is overstated. The haul distance should be <br />about 600 feet. <br />2. Task 015, rip McClane to Munger haul road, should be deleted. The <br />construction of this road is no longer contemplated in the permit. <br />3. Task 040, replace topsoil from stockpile to road from McClane to Munger <br />should be deleted. The construction of this road is no longer contemplated in <br />the permit. <br />4. The haul distance for task 041 is overstated. The haul distance should be <br />about 650 feet. <br />Thank you for your consideration of these comments. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: One Copy Denver Office
The URL can be used to link to this page
Your browser does not support the video tag.