Laserfiche WebLink
Memo to File <br />January11, 2008 Page 2 <br />on since the submittal of TR-55. Here are a few new complaints that they conveyed to <br />me during the phone call: <br />Gravel was mixed in to the topsoil that was placed on their land and then covered <br />with more topsoil. <br />¦ They had some new complaints regarding the post-mine topography being too <br />sloping on their property and a ditch will be needed around the perimeter. <br />Bud Benson's property to the north was put back 25 feet higher than it should <br />have been. <br />¦ They also had a complaint that the CC Ditch Company did not leave stub outs on <br />their property like they were supposed to during the recent pipeline project. <br />¦ The seed mix was incorrect that they are using on Pond 011 and the topsoil pile. <br />I reiterated that they should follow up with a written request for an inspection if they feel <br />that a violation has occurred or they have a safety concern. We also discussed the <br />upcoming revision to replace TR-55 and I guaranteed them that we will not approve <br />anything on their land or anyone else's until we have landowner written comments <br />regarding any changes to the post mine land use or reclamation plan. They appeared to <br />be satisfied with my answers and indicated that they would be patient and wait until they <br />hear from the Division or from WFC regarding the Morgan's input on any potential <br />changes to the revegetation or reclamation plans. <br />C: Sandy Brown, Marcia Talvitie, Dan Mathews