Laserfiche WebLink
Table 2 <br />OPERATIONAL LOSSES <br />Evans #2 Pit <br />2009 Plan Year <br /> <br />Plan Year <br />2009 <br />Month Amount of <br />Aggregate <br />Production <br />(tons) Water Lost <br />With Mined <br />Aggregate <br />(acre-feet) Water Used <br />for Dust <br />Control <br />(acre-feet) Total <br />Operational <br />Losses <br />(acre-feet) <br />April 100,000 2.94 0.08 3.02 <br />May 100,000 2.94 0.08 3.02 <br />June 50,000 1.47 0.08 1.55 <br />July 50,000 1.47 0.08 1.55 <br />August 50,000 1.47 0.08 1.55 <br />September 50,000 1.47 0.08 1.55 <br />October 50,000 1.47 0.08 1.55 <br />November 0 0.00 0.00 0.00 <br />December 0 0.00 0.00 0.00 <br />January 0 0.00 0.00 0.00 <br />February 0 0.00 0.00 0.00 <br />March 50,000 1.47 0.08 1.55 <br /> <br />Total 500,000 14.72 0.61 15.33 <br />Notes: <br />(1) Projected mining provided by Fremont Paving & Redi-Mix. <br />(2) Column (2) times 2000 times 4% divided by 62.4 divided by 43,560. <br />(3) Based on 25,000 gallons per month as provided by Fremont Paving & Redi-Mix. <br />(4) Equals the sum of Columns (2) and (3). <br />Deere & Ault Consultants, Inc. 1213M008 PA0183 Evans #2 Pit\005 2009 SWSP Renewal\2009 Evans#2 SW SP Tables