My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-16_REPORT - C1981044 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981044
>
2009-04-16_REPORT - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:38 PM
Creation date
4/17/2009 9:58:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REPORT
Doc Date
4/16/2009
Doc Name
2008 Annual Reclamation Report
From
BTU Empire Corporation
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />?????VV <br />Peau!Lu <br />=4 qffla <br />PQ? 1 ? r?ma?,o? <br />BTU Empire Corporation aNdsa{e? <br />29515 Routt County Road #27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />April 14, 2009 <br />Mr. James Stark RECE <br />Environmental Protection Specialist APR 16 2009 <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street - Room 215 Dsior? °` "' <br />Mining and SaMy <br />Denver, Colorado 80203 <br />(303) 866-3567 X8145 <br />RE: BTU Empire Corp. - Eagle 5 & 9 Mines (Permit C-81-044), 2008 Annual Reclamation Report <br />(ARR) <br />Dear Mr. Stark: <br />Enclosed are duplicate copies of the 2008 Annual Reclamation Report. The Mine remains in Temporary <br />Cessation, and the only new disturbance or reclamation completed during 2008 was development of the <br />permitted (TR07-34) solid waste disposal site, demolition of selected facilities and reclamation of the <br />associated disturbance areas, disposal of the demolition wastes, and reclamation of a portion of the solid <br />waste disposal area. Site maintenance and monitoring activities continued, as in previous years, under the <br />Temporary Cessation status. <br />BTU Empire Corporation (BTUEC) developed the eastern portion of the permitted solid waste disposal <br />facility, within the previously disturbed No. 9 Portal area. Development involved maintenance of the <br />existing light-use road, minor maintenance of existing drainage structures, and excavation of a portion of <br />the permitted disposal area, with placement of the excavated material adjacent to the excavation to serve <br />as cover and final fill. BTUEC contracted an asbestos survey of all facilities identified for potential <br />demolition as part of the pemaitting effort for facilities demolition. The survey identified minor <br />occurrences of Asbestos Containing Building Materials (ACBM) in the No. 9 Warehouse, Oakey Plaza, <br />Laboratory Trailer, and Bathhouse. BTUEC subsequently contracted with a licensed asbestos removal <br />firm for removal and proper disposal of all ACBM's. Following ACBM removal, BTUEC completed <br />demolition of the following facilities: <br />? No. 9 Warehouse <br />? Oakey Plaza (Reclamation Storage Building) <br />? Brazell-Simms Building (Partially collapsed by windstorm about two years prior to final <br />demolition) <br />? Laboratory Trailer <br />? Storage Shed (Lab Sample Storage Building) <br />? Bathhouse <br />? Miscellaneous Buildings (Compressor House, <br />Warehouse Fencing, Brazell-Simms Well-House <br />Shop) <br />Oakey Plaza Well-House, Guard-Shack and <br />, Shed near Wise Hill Portal, Old Carpenter
The URL can be used to link to this page
Your browser does not support the video tag.