My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-16_REVISION - X200923100
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200923100
>
2009-04-16_REVISION - X200923100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:39 PM
Creation date
4/17/2009 8:46:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200923100
IBM Index Class Name
REVISION
Doc Date
4/16/2009
Doc Name
Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
AM1
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : X07 <br />Date : 0411312009 <br />User : JDM <br />State : Colorado <br />County :Routt <br />Site : Sage Creek <br />Agency or organization name : CDRMS <br />Permit or other job action : Sage Creek Project AM1 <br />Task description : Regrade Drill Pads and Mud Pits for Geotechnica/ Site <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D6R LGP - 6S (2003) Horsepower : 185 <br />Blade type : Straight <br />Attachment no. 1 : ROPS Cab Shift basis : -I per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $30.42 NA <br />Operating cost/hour : $46.64 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $109.84 Total fleet cost/hour : $109.84 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,260 LCY factor : NA volume : 7,260 LCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Loam <br />5.00 % (pos) <br />6,600 feet <br />2,100 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.501 /LCY <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.10 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Adjusted unit production : 219.03 LCY/hr <br />Adjusted fleet production : 219.03 LCY/hr <br />Total job time : 33.15 Hours <br />Total job cost : $3,641 <br />Permit/job# :X-2009-231-00 <br />Abbreviation :none <br />Filename :X-00-X07
The URL can be used to link to this page
Your browser does not support the video tag.