My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-15_REPORT - M1977247 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977247
>
2009-04-15_REPORT - M1977247 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:22:59 AM
Creation date
4/16/2009 1:45:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
REPORT
Doc Date
4/15/2009
Doc Name
Annual Fee/Report/Map
From
Holcim (US) Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMITTEE NAME: <br />PERMIT NO.: <br />OPERATION NAME: <br />ANNIVERSARY DATE: <br />ANNUAL FEE DUE: <br />COUNTY: <br />ANNUAL FEE and REPORT REQUEST <br />Holcim (US) Inc. <br />VM-1977-247 <br />Coaldale Quarry <br />April 28, 2009 <br />FtECENEED <br />APR 15 2000 <br />b?G <br />Division of Reclamation, <br />-)? Mining and Safety <br />$$791.00 (Due on or before your anniversary date) <br />Fremont <br />According to C.R.S. 34-32.5-116 or C.R.S. 34-32-116, each year, on the anniversary date of the permit, an operator <br />shall submit the annual fee, a report and map showing the extent of current disturbances to affected land, <br />- reclamation -accomplished to date and during the-preceding year, new-disturbances--that are-anticipated-to-occur - - <br />during the upcoming year, reclamation that will be performed during the coming year, the dates for the beginning <br />of active operations, and the date active operations ceased for the year, if any. <br />Please attach your revised written annual report and annual report map to this form. The Annual Report <br />& Fee requirement is not met until we have received the following components: fee, report, and associated <br />map. If no new disturbances or reclamation have occurred during the previous year and no new changes to <br />the previous year's map are necessary, then no new map is required, provided that the Operator shall state <br />this in the Annual Report. Please note that an adequately labeled map that clearly delineates and includes the <br />above elements may suffice for a written report. <br />Division records indicate the following permittee contact information. Please verify and make any necessary <br />changes: <br />Permittee Contact: Michael B. Toelle <br />Permittee Name <br />Address: <br />Joe Lamanna - Quarry Manager <br />Holcim (US) Inc. <br />3500 Highway 120 <br />Florence, CO 81226 <br />Phone Number: (719) 784-6325 <br />Fax Number: (719) 784-3470 <br />If you have additional comments and/or information that should be provided to the Division, please provide it <br />below or attach it to this form along with your written report and map. Annual Report instructions are enclosed. <br />?"--P- '6? <br />Signature of Corporate Officer, Owner, or Designee <br />44e?l 3 <br />Date
The URL can be used to link to this page
Your browser does not support the video tag.