Laserfiche WebLink
As such, the Division proposes to approve a release of $2,847,340.00, from the bond amount currently held <br />($7,183,489.00). This corresponds to the proposed reduction in liability of $1,975,695.00 (the <br />difference being the amount by which the current bond held exceeds the liability amount). <br />The original permitted acreage for interim and permanent program disturbance was 1,968.8 <br />acres. Of that original acreage, Phase I bond release has been granted on 1,795.4 acres. This <br />Phase II proposed decision will release 1,213.1 interim/permanent acres. Upon final approval, <br />there will remain 173.4 interim/permanent acres upon which no releases have been granted, <br />582.3 acres upon which only Phase I has been granted, and 1213.1 acres upon which only <br />Phases I and II have been granted. Acreage figures for the pre-law areas remain unchanged <br />with this proposed release; there are 68.79 acres that have not been released from liability. <br />SENECA II MINE BOND RELEASE ACREAGE <br />Interim and Permanent Program Areas <br /> Total <br />Disturbed Phase I <br />Released Phase II <br />Released Phase III <br />Released <br />SL-1 1968.8 1795.4 <br />SL-2 1968.8 NA NA NA <br />SL-3 1968.8 1213.1 <br />Pre-Law Areas <br />SL-1 326.5 259.1 <br />SL-2 326.5 257.71 257.71 <br />SL-3 326.5 NA NA NA <br />SENECA II MINE BOND LIABILITY ACREAGE <br />Interim and Permanent Program Areas <br /> Total <br />Disturbed Phase I Not <br />Yet Released Phase II Not <br />Yet Released Phase III <br />Not Yet <br />Released <br />SL-1 1968.8 173.4 1.968.8 1968.8 <br />SL-2 1968.8 173.4 1.968.8 1968.8 <br />SL-3 1968.8 173.4 755.7 1968.8 <br />Pre-Law Areas <br />SL-1 326.5 67.4 326.5 326.5 <br />SL-2 326.5 NA NA 68.79 <br />SL-3 326.5 NA NA 68.79 <br /> <br />20