Introduction <br />This report is for the period from July 2008 through December 2008. Mine Construction <br />of the Bowie No. 2 Mine began during May of 1997, with coal production beginning <br />during August 1997. <br />The mining permit application for the Bowie No. 2 Mine requires the operator to submit <br />the results of the subsidence monitoring programs and the results of the visual <br />inspections of known modern and historic landslides within the permit and adjacent <br />area for stability in June and December of each year and report these results to the <br />Division within 30 days of the ends of the reporting periods. <br />The operator is also required to inspect these landslides, both modern and historic, <br />monthly for six months immediately after retreat mining occurs. This same inspection <br />routine is applied to any spring or pond in the immediate proximity of retreat mining. <br />Longwall mining during the period included finishing the B-7 panel. The longwall <br />operated in the B-7 Panel starting in July and completing in December. The 2nd East <br />Mains were completed during the period. Development for the B-8 panel was <br />approximately 50% complete by the end on the reporting period. <br />Visual Inspection of known historic and modern landslides. <br />A visual inspection of all known historic and modern landslides was conducted during <br />• November 25, 2008 by Brad Lindsay, Rock Logic Consulting LLC. Mr. Lindsay's report <br />is attached. Fiver new subsidence cracks were noted. <br />Increased Inspection activity associated with retreat mining. <br />Accessible subsidence cracks are repaired during coal exploration events and are <br />monitored by both coal exploration supervisors and hydrologic monitoring technicians. <br />The accessible visual results of the subsidence effects associated with the Bowie No. 2 <br />Mine are overlain on Map 27-C Subsidence Features. Map 27-C is enclosed. During <br />this period, Springs 2, 3, 4, 4A and Pond 4 were impacted or re-impacted by the <br />longwall during the period October through December. Springs 5, 5A, 5B and Pond 5 <br />were impacted or re-impacted by 2nd East Main development during May and June. <br />Potentially impacted or re-impacted means the mine workings or angle of draw of the <br />mine workings passed under the monitoring point during the reporting period. No <br />influence to any hydrologic monitoring points was observed during this period. <br />Results of Subsidence Survey Monitoring <br />The results of the October and December 2008 monitoring are attached. As in the <br />past, the survey was performed by Cragg Surveying using GPS methods. <br />Analysis of Subsidence Data <br />The following table presents an analysis of the subsidence survey data. Panel B-6 was <br />• completed in January and February. Following is a summary of the survey data <br />collected during the period. There was no activity near Hubbard Creek or Dove Gulch. <br />2