Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />0 2008 Annual Hydrology Report Deer-up <br />Canal - Deer Trail Ditch <br />Elevation - 6960 <br />Surface Water <br />Initiated 6/14/1995 6/14/1995 6/14/1995 6/14/1995 6/14/1995 <br />Activated 3/30/1997 3/30/1997 3/30/1997 3/30/1997 3/30/1997 <br />Date 11/25/2008 9/22/2008 8/11/2008 6/18/2008 4/22/2008 <br />Summary Information <br />H : I.1 Baseline Operation <br />r ,. .. i W170 KA;. A- KA- Lei,. A„o new.. <br />Flow CFS 2.4 8.0 0.2 1.8 4.8 1.11 1.50 1.64 1.64 1.11 <br />Water Level in Flume Feet 0.44 1.00 0.08 0.36 0.72 0.28 0.34 0.36 0.36 0.28 <br />FieldComment <br />ph su M6.4 8.5 9.1 7.4 8.4 9.1 8.3 8.3 8.3 8.3 <br />Conductivity umhos/cm 286 668 50 187 320 290 230 230 50 90 <br />Temperature Celsius 11.4 20.3 0.2 10.2 20.7 0.2 12.4 18.8 10.0 5.2 <br />DO mg/L 3.5 7.7 0.0 8.8 11.7 10.4 7.9 8.3 8.3 9.3 <br />• <br />The upper end of Deer Trail Ditch is monitored at the headgate located on Hubbard Creek. This monitoring point is fitted with a <br />2' Parshall Flume. <br />C <br />Baseline Information for Point Deer-up is derived from events beginning on 6/14/95 through 3/30/97. <br />Point influenced by mining on 3/30/97. <br />Figure No. 108