Laserfiche WebLink
<br />Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2008 Annual Hydrology Report <br />DH-65 <br />Dove Gulch - Monitoring Well <br />Pipe Elevation - 7845 <br />Pipe 1.15' above ground <br />Depth -1020.6' <br />Ground Water <br />Initiated 10/12/2000 10/12/2000 10/12!2000 <br />Activated <br />Date 11/24/2008 9/24/2008 5/22/2008 <br />Summary Information <br />Fielrl Baseline Operation <br />Para it-E1-f IINITS Min Gva hAnv Min A.. KAw <br />Static Water Level Feet 1020.6 1020.6 1020.6 <br />Water Elevation Feet 6824.4 6824.4 6824.4 <br />FieldComment <br />ph su <br />Conductivity umhos/cm <br />Temperature Celsius <br />• <br />11 <br />Lab <br />araii?a?r <br />UNITS <br />Bicarbonate mg/L <br />Carbonate mg/L <br />Chloride mg/L <br />Conductivity umhos/cm <br />Hardness mg/L <br />Nitrate-Nitrite mg/L <br />Ammonia <br />pH <br />Phosphate <br />ResidueFilterable (TDS) <br />Sulfate <br /> <br />Arsenic j <br />Cadmium <br />Calcium <br />Iron (Dissolved) <br />Iron otal <br />Magnesium <br />Manganese (Dissolved) <br />Manganese (Total) mg/L <br />Mercury mg/L <br />Selenium mg/L <br />Sodium mg/L <br />Zinc mg/L <br />The area of concern for monitoring point DH-65 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />The monitoring point location for DH-65 is located along an ATV trail, near the mouth of Dove Gulch. This hole is <br />completed above the D seam. <br />*Probe sticking to side of casing before hitting bottom or water. <br />Baseline Information Collection initiated on 10/12/00 and not yet considered complete. <br />Point DH-65 has not been influenced by mining. <br />Figure No. 142