Laserfiche WebLink
• <br />Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2008 Annual Hydrology Report <br />DH-25 <br />C Gulch - Drill Hole <br />Pipe Elevation - 7144.17 <br />Pipe 2.3' above ground <br />Depth - 325' <br />Ground Water <br />Initiated 6/12/1995 6/12/1995 6/12/1995 6/12/1995 <br />Activated 3/30/1997 3/30/1997 3/30/1997 3/30/1997 <br />Date 12/10/2008 9/19/2008 6/23/2008 4/24/2008 <br />• <br />.7 <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Static Water Level Feet 314.62 315.44 316.61 173.79 313.93 320.38 315.21 315.1 315.16 315.25 <br />Water Elevation Feet 6827.6 6828.7 6829.6 6823.8 6830.2 6970.4 6828.96 6829.07 6829.01 6828.92 <br />FieldComment Blockage* Blockage* Blockage* Blockage* <br />ph su 6.6 7.6 7.9 7.3 7.7 8.0 <br />Conductivity umhos/cm 4800 5112 5683 3700 4733 5000 <br />Temperature Celsius 15.6 17.9 20.2 11.4 16.7 18.9 <br />Field <br />Paracnei is UNITS <br />*Apprx. 4' of casing has been broken off well by construction - can not get bailer to water for sampling. <br />Drill Hole 25 is located immediately above the mine portals on a southern facing slope at the end of an old coal exploration road. <br />Baseline Information for Point DH-25 is derived from events beginning on 6/12/95 through 3/30/97. <br />Point influenced by mining on 3/30/97. <br />Figure No. 134