My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-09_REVISION - M1995027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995027
>
2009-04-09_REVISION - M1995027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:48 PM
Creation date
4/15/2009 2:16:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995027
IBM Index Class Name
REVISION
Doc Date
4/9/2009
Doc Name
Response
From
OSE
To
DRMS
Type & Sequence
CN1
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DEPARTMENT OF NATURAL RESOURCES elaly_ z <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />Bill Ritter, Jr <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Dick Wolfe, P.E. <br />Director <br />DATE: April 9, 2009 <br />VTO: David A. Bird, Environmental Protection Specialist <br />CC: Division 1 Office; D. trict 23 Water Commissioner <br />FROM: Don West, P.E. <br />RE: Ansley No. 2 Pit, File No. M-1995-027 <br />Operator: Park County <br />Contact: Doug Keith 719/836-4282 <br />Section 11, Twp IOS, Rng 77W, 6th P.M., Park County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />? The proposed operation will consume ground water by: ? evaporation, ? dust control, <br />? reclamation, ? water removed in the mined product, ? processing, ? other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />? Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />? Other: <br />COMMENTS: <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water.state.co.us <br />ICE s"MD <br />APR 0 9 2009 <br />T oision of ReClarrotion, <br />Office of the State Engineer vkft and Sd*
The URL can be used to link to this page
Your browser does not support the video tag.