Laserfiche WebLink
Bowie Resources, LLC April 10, 2008 <br />• Bowie No. 2 Mine <br />2008 Annual Hydrology Report <br />North Fork Alluvium Monitoring Wells <br />Alluvial monitoring wells AW-1 through AW-6 are located near the mine entrance along <br />the north side of Bowie Road. These wells are monitored quarterly for field parameters <br />and semi-annually for full suite laboratory parameters during the second and fourth <br />quarters in accordance with the permit application. Alluvial monitoring wells AW-7 <br />through AW-9 are located near the mine entrance along the south side of Bowie Road. <br />AW-10 cannot be reliably sampled due to a collapse of the casing, and will be <br />eliminated from the monitoring plan. These wells were installed as a requirement of <br />PR-03 which allowed the mine operator to relocate Sediment Pond B to the south side <br />of the highway. Alluvial Wells 11 through 13 were installed during the fall of 2000 to <br />monitor the alluvium in the area where the new coal loadout (PR-06) was constructed. <br />Alluvial well 13 was eliminated by the construction of the unit train loadout. Alluvial well <br />14 was installed during 2003 west of Pond K. Alluvial wells 15 through 17 were <br />installed during the fourth quarter of 2003 and are located north of Bowie Road below <br />the coal mine waste disposal area. <br />The 2008 sampling season provides results consistent with baseline information <br />provided in the permit application, showing no adverse impact to groundwater during <br />the construction of the mine. <br />Surface Water Monitoring Stations: PONDS <br />Ponds were sampled for water quality when discharging or inflows/outflows were <br />occurring. Ponds are typically spring-fed or seep-fed and exhibit diffuse non- <br />concentrated areas of inflow. Often the pond outlets present the only point of <br />concentrated flow at which flow measurements and field parameters can be obtained. <br />Where possible, quality measurements are obtained at the pond inlet. Stagnant water <br />in ponds is not sampled since water quality results would show the effects of <br />evaporation and stock use and could not be used to evaluate potential mine affects. <br />Stock Ponds P-1 through P-6 and P32-3, P33-3, P33-7, P33-10 and P33-11 are <br />monitored quarterly for inflow or outflow and water level. Water level is measured as <br />freeboard above spillway outlet or depth of water in the pond measured from the bottom <br />of the pond. Field data collected during the 2008 sampling season is consistent with <br />baseline information provided in the permit application. <br />Surface Water Monitoring Stations: SPRINGS <br />Fifty seven springs within the permit boundary were monitored during the 2008 <br />monitoring season in accordance with the Hydrologic Monitoring Plan. This plan <br />indicates that identified springs will be inspected quarterly for field parameters with full <br />suite laboratory parameters required on springs with flows greater than five (5) gallons <br />per minute. During the construction phase of the mine, four (4) springs (S-6, S-7, S-9 <br />and S-15) were eliminated by road and portal bench construction activities. The 2008 <br />4