Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2008 Annual Hydrology Report <br />SP33-6 <br />Terror Creek - Spring/Pond 33-6 <br />Elevation - 7680 <br />Depth -1.5' <br />Surface Water <br />Initiated 10/31/1997 10/31/1997 10/31/1997 10/31/1997 <br />Activated <br />Date 10/30/2008 8/26/2008 7/2/2008 5/30/2008 <br />Summary Information <br />Field <br />Parameters Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow GPM 0.00 0.09 0.50 0.1 0.1. 0.1 0.2 <br />FieldComment <br />ph su 7.1 7.8 8.3 7.9 8.1 7.9 8.2 <br />Conductivity umhos/cm 220 532 800 663 600 560 425 <br />Temperature Celsius 1.2 11.1 23.6 1.2 15.4 10.9 23.6 <br />Lab, <br />Parameters <br />UNITS <br />Bicarbonate mg/L 254 254 254 <br />Chloride mg/L 4 4 4 <br />Conductivity umhos/c 595 595 595 <br />Hardness mg/L 87 87 87 <br />Nitrate-Nitrite mg/L .04 0.04 0.04 <br />Oil and Grease mg/L DL <MDL <MDL <br />pH su 7.7 7.7 7.7 <br />Phosphate mg/L DL <MDL <MDL <br />ResidueFilterable-TDS mg/L 350 <br />1 350 350 <br />ResidueNonFilterable-TSS mg/L 168 168 168 <br />SAR DL <MDL <MDL <br />Sulfate mg/L 50 50 50 <br />Aluminum mg/L .03 8.03 8.03 <br />Arsenic mg/L 002 0.002 0.002 <br />Cadmium mg/L DL <MDL <MDL <br />Calcium mg/L 24.8 24.8 24.8 <br />Copper mg/L DL <MDL <MDL <br />Iron (Total) mg/L 7.42 7.42 7.42 <br />Lead mg/L <MDL <MDL <MDL <br />Magnesium mg/L 6.00 6.00 6.00 <br />Manganese (Total) mg/L 0.08 0.08 0.08 <br />Mercury mg/L <MDL <MDL <MDL <br />Molyebdenum mg/L <MDL <MDL <MDL <br />Selenium mg/L <MDL <MDL <MDL <br />Sodium mg/L 101 101 101 <br />Zinc mg/L 0.04 0.04 0.04 <br />The area of concem for monitoring point SP33-6 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />The monitoring point location for SP33-6 is located just below the Terror Creek descent road that passes Pond 33-7 and Spring 33-8 and Spring <br />and Pond 33-5. <br />• <br />• <br /> <br />Baseline Information Collection initiated on 10131/97 and not yet considered complete. <br />Point SP33-6 has not been influenced by mining. <br />Figure No. 2