Laserfiche WebLink
4. Mineral Rules and Regulations of The Colorado Mined Land Reclamation Board for <br />Hard Rock, Metal and Designated Mining Operations, May 1977, amended August <br />2006 <br />5. NRC Regulatory Guide 4.14, "Radiological Effluent and Environmental Monitoring <br />at Uranium Mills," 1980 <br />6. NRC Regulatory Guide 3.46, "Standard Format and Content of License Applications, <br />Including Environmental Reports, for In Situ Uranium Solution Mining", 1982 <br />7. NUREG 1569, "Standard Review Plan for In Situ Leach Uranium Recovery License <br />Applications", 2003 <br />8. NUREG/CR 5849, "Manual for Conducting Radiological Surveys in Support of <br />License Termination", J D Berger, 1992 <br />9. NUREG 1575, "Multi Agency Radiological Site Survey and Investigation Manual" <br />(MARSSIM), 2000 <br />10. USEPA "Manual for Chemical Analysis of Water and Wastes" EPA-625-/6-74-003a, <br />1974. <br />11. NUREG 1910, Generic Environmental Impact Statement for In Situ Uranium <br />Recovery, 2008 (Draft) <br />12. EPA Method 115, 40 Code of Federal Regulations (C.F.R.), Part 61, National <br />Emission Standards for Hazardous Air Pollutants: Radionuclides; Final Rule and <br />Notice of Reconsideration, December 15, 1989 <br />1.5 Regulatory Interaction <br />During the course of planning and implementing the SCP, Powertech and R2 representatives met <br />with representatives of agencies responsible for licensing and permitting ISR facilities in <br />Colorado. These agencies include: <br />• Weld County Planning and Zoning Department <br />• Weld County Public Health Environmental Health Services Division <br />• Colorado Department of Public Health and Environment, Radioactive Materials Division <br />(CDPHE) <br />• Colorado Department of Natural Resources, Division of Reclamation, Mining and Safety <br />(DRMS) <br />• Colorado Division of Water Resources <br />• U.S. Environmental Protection Agency, Region VIII, Underground Injection Control <br />Division (EPA). <br />April 2009 3 Site Characterization Plan